Locator Hist Soc - HS-D11104 Type Drawing Doc Number 2485A
Description Erection Diagram, East River Crossing, Tidewater Rwy., Co. Norfolk, Va, McClintic-Marshall Construction Co., Pittsburg, PA.
Notes Milepost 324.1?
Date 02/23/1907 Revision Date 10/03/1908
Author   Accession 2009.001 : NS Corp/Va Tech Collection

Erection Diagram, East River Crossing, Tidewater Rwy., Co. Norfolk, Va, McClintic-Marshall Construction Co., Pittsburg, PA.

Size: 36in x 23in (91cm x 59cm)


Structures Indexes
Category Type
Bridge  

Railroads and Companies
Abbreviation Name
Tidewater Rwy Tidewater Railway
VGN Rwy Virginian Railway
  McClintic-Marshall Construction Co

Division Indexes
Road Name Division District/Branch Mile Post
VGN Rwy New River   324.1