Locator Hist Soc - HS-C01459 Type Drawing Doc Number Y23
Description N&W RR, Plan for Revewal of Bridge 1902 over 4th St. Winston-Salem. Half-Through Plate Girder Span 66 ft long.
Notes Bridge raised in 1916 by N&W forces.
Date 06/20/1896 Revision Date 12/01/1927
Author N&W RR - Engr Maint of Way Accession 2005.004 : Library of Virginia

N&W RR, Plan for Revewal of Bridge 1902 over 4th St. Winston-Salem.  Half-Through Plate Girder Span 66 ft long.

Size: 17in x 9in (43cm x 23cm)


Cities Indexes
City State
Winston-Salem NC

Structures Indexes
Category Type
Bridge  
Bridge Through Plate Girder

Railroads and Companies
Abbreviation Name
N&W RR Norfolk & Western Railroad

Division Indexes
Road Name Division District/Branch Mile Post
N&W RR Winston-Salem