Locator | Hist Soc - HS-C10754 | Type | Drawing | Doc Number | 7408-3 | |
---|---|---|---|---|---|---|
Description | Record of Construction Tunnel No. 3, Double Tracking Welch to Davy - Antler Tunnel No. 1 (Deegans Tunnel). | |||||
Notes | Estimates and Progress by Month for both Excavation and Lining, Sections. | |||||
Date | 04/17/1906 | Revision Date | ||||
Author | N&W Rwy - Engr in Charge | Accession | 2009.001 : NS Corp/Va Tech Collection |
Size: 12in x 16in (32cm x 41cm) |
Structures Indexes | |
---|---|
Category | Type |
Tunnel | |
Tunnel | Double Track |
Track | Double Tracking |
Railroads and Companies | |
---|---|
Abbreviation | Name |
N&W Rwy | Norfolk & Western Railway |
Division Indexes | |||
---|---|---|---|
Road Name | Division | District/Branch | Mile Post |
N&W Rwy | Pocahontas |